In these production meetings the sound department has begun drawing technical sketches of how the equipment and cabling will be laid out in the hall. This has involved two different drawings , one of the hall as a whole and another of the band pit.
This is the band pit drawing. (^)
This is the notes from production meeting 7 (^)
No comments:
Post a Comment